PROJECTS TO DEVELOPMENT READINESS IN AN HOUR

We automate the development stages of software projects so that costs and time are significantly reduced.

What?

We have built a generic project framework that includes frontend, backend, pipeline and test automation readiness.

Why?

This enables development work to start immediately. Our customers save two weeks to four months of development time and budget. It is also possible to clone the framework into several different development environments in an instant, so that the development work becomes even more agile.

How?
DEVELOPMENT STARTED IN 2022.

The main purpose of the system framework is to simplify the development work. In development projects, there are several repetitive things for which ready-made bases can be used. The speed of setting up a new environment also plays an important role.

The finished system frame is constantly being developed in line with the latest technologies and methods.

System
Want to hear more?
Helena Lindberg_fullres.jpg

Helena

Chief Growth Officer

A fast start to project development

The implementation phase of the software development project begins with the definition and implementation of the system foundations. In most projects, the work steps of the foundation and the code to be produced are largely the same, so there is a lot of repetition between different projects. In Amabit's system framework, the frameworks of repetitive sub-areas have been assembled into configurable components, with which a new system can be brought to the development stage in hours.

Systemframe-2.png
Start

The configurable system frame saves up to 40-80 percent of the implementation time and costs of the early development stages phase.

Development phase

A software project often starts with some kind of Proof of Concept implementation. PoC requires a working environment, so the implementation of the actual functionality is a very small part of the total time used for the PoC phase in a traditional project. In addition, in PoC implementations, the framework of the system is implemented with temporary solutions, in which case the transition from PoC to the development phase often means rewriting the code.

Amabit's system framework is immediately ready for PoC implementation. The back-end system installed in the cloud service can be connected to any service, the results of which in turn are obtained through the API interface already connected to the user interface of the application. Any changes that may be required to the frame can be made easily by configuration, so the entire implementation is always of production quality, which enables a direct transition from the PoC phase to the production phase.

Quality assurance

Quality assurance of a software project always takes place at several different levels, from unit testing to end-to-end testing. Test automation must be considered in the implementation so that the system can be easily tested. The implementation of test automation afterwards often requires partial rewriting of the code, which in turn slows down the development work or leads to compromises at the expense of test coverage.

Amabit's system framework includes a test automation framework that automatically steers further development in the right direction in terms of testability and also enables the system itself to be tested at any stage.

Environments

System development usually takes place in stages in dev, staging and production environments. In addition to these, for example, test, demo and quality assurance environments may be needed, all of which should be as similar as possible to each other.

 

With the help of Amabit's system frame, the system can be cloned in less than an hour, and a practically unlimited number of environments that are independent of each other but have identical components.

Opening new production environments, for example in different economic areas, can be easily done using the same principle as cloning other environments.